Jammu’s Tawi Riverfront Nears Completion. Jammu’s dream takes shape. Around 96% development has been done on the left bank and 94% development on the right bank. Tawi Barrage development is estimated at 86% and a lake is in the making. Jammu’s Riverfront glowup is almost there. The total length of Tawi Riverfront development is 7.0 KM on both sides and the project cost stands at 191 CR.