Skip to main content

Kashmir Ahead

Vande Bharat Express successfully conducts trial run on Katra-Sangaldan section of USBRL

Screen Shot 2025 04 16 at 11.12.16 AM

Srinagar, April 16, 2025: A trial run of the Vande Bharat Express was successfully conducted on the Katra-Sangaldan section of the 272-km Udhampur-Srinagar-Baramulla Rail Link in Jammu and Kashmir, officials confirmed. The high-speed train, stationed at Katra, underwent rigorous testing to ensure operational readiness on this critical stretch of the mega railway project. The Vande […]

PM Narendra Modi’s USBRL inauguration visit postponed

pm modi 2 1 860x573 2

Srinagar, April 16, 2025: The highly anticipated visit of Prime Minister Shri Narendra Modi to inaugurate the Vande Bharat Express on a section of the 272-km Udhampur-Srinagar-Baramulla Rail Link , a mega railway project, has been postponed, officials confirmed. No new date for the visit has been announced. Preparations for the PM’s visit were in […]

Northern railway’s USBRL project wins prestigious build India infra award 2025

Screenshot 2025 03 02 at 11.09.05 AM

March 02, 2025- Northern Railway’s Udhampur-Srinagar-Baramulla Rail Link (USBRL) has clinched the coveted Build India Infra Award 2025 in the “Impact” category, recognising its monumental contribution to connectivity and economic growth in Kashmir. The 272-km railway line, a marvel of modern engineering, was honored for bridging the Kashmir Valley with the rest of India through […]

×